Construction Update June 7th, 2016
Sorry for the week hiatus on the update posts. Last week the floors were being worked on and we had very limited access to the inside of the building. The floors in the treatment areas are in place. We moved the cages into the dog and cat wards on Sunday and fit the space well. The floors are covered currently to protect them for the remainder of construction (can’t see the pattern/color in today’s pictures). The lights electrical are being installed currently and the fixtures look great. The garbage enclosure is up with only the gates on the enclosure remaining to be installed. Sheet metal is almost done and gutters remained to be installed. The building was cleaned/pressure washed over the weekend in preparation for painting. The floors in the west end near reception are being done this week. Enjoy the weekly pictures, and once again the anticipated move in date is still June 21st.
Floors
Pharmacy
Cat Ward With Tops
Pharmacy Lighting
Dog Ward
Treatment Room Lights
Procedure Room Lighting
Surgery Lighting
Procedure Room Door
Dog Ward Cages with Top
Isolation HVAC Unit
Isolation Lighting
New Doors
Isolation Lighting
Isolation Lighting
Isolation Hallway Lighting
Painting Prep
Moved the sign to prep for painting
Garbage Enclosure
Charting/Tech Room
Pharmacy Hall
Radiology
Pharmacy
Dog Ward/Door
Surgery
Treatment
Treatment
Laundry
Cat Ward Cages
Cat Ward Cages
Pharmacy/Treatment
Treatment/Surgery Prep
Dog Ward Cages
Dog Ward Cages
Dog Ward Cages